Depending on the size of the Project, Production/Manufacturing will take approximately 4 – 6 weeks from the time Engineering releases all Cut-Lists. If the Project consists of Highly Detailed Custom Units with Exotic Materials, the fabrication time line will need to be reviewed and adjusted on a per job basis.